subject
Mathematics, 23.04.2021 22:30 brittanysanders

a company found that an experienced surveyor can survey a roadbed in 4 hours. An apprentice surveyor needs 6 hours to survey the same stretch of road. If the two work together, find how long it takes them to complete the job

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:40
Matilda and kathryn went on different road trips over spring break.the equation below represents the number of miles matilda drove in x hours.y = 60xthe table below shows the number of miles kathryn drove in x hours.time(in hours)distance(in miles)114228342456who drove at a greater speed? a. matilda drove at a greater speed.b. matilda and kathryn drove at the same speed.c. kathryn drove at a greater speed.d.there is not enough information to determine their speeds
Answers: 2
question
Mathematics, 21.06.2019 14:00
Easy points boii. read it. ya. fresh
Answers: 1
question
Mathematics, 21.06.2019 21:00
Graph the equationy=x^2 -[tex]y = x^{2} - 2[/tex]
Answers: 1
question
Mathematics, 21.06.2019 22:00
Type the correct answer in the box. consider the system of linear equations below. rewrite one of the two equations above in the form ax + by = c, where a, b, and c are constants, so that the sum of the new equation and the unchanged equation from the original system results in an equation in one variable.
Answers: 2
You know the right answer?
a company found that an experienced surveyor can survey a roadbed in 4 hours. An apprentice surveyor...
Questions
question
Mathematics, 18.08.2019 04:10