subject
Mathematics, 20.04.2021 17:30 jordantotten96

An architect designing a bridge provides the recommendation that the builders hire 3 workers for every 2.5 tons of steel needed to construct the bridge. Which method would best be used to find how many workers to hire to build a bridge that requires 30 tons of steel?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
1. evaluate 8x(2)y9(-2) for x=-1 and y=2 2. simplify the equation. -() 3. simplify the expression. [tex]\frac{5}{x(-2) y9(5)}[/tex]
Answers: 1
question
Mathematics, 21.06.2019 21:10
If f(x) and g(x) are inverse functions of each other, which of the following shows the graph of f(g(x)
Answers: 1
question
Mathematics, 21.06.2019 21:30
(03.03 mc) choose the graph below that correctly represents the equation 2x + 4y = 24. (5 points) select one: a. line through the points 0 comma 6 and 12 comma 0 b. line through the points 0 comma negative 6 and 12 comma 0 c. line through the points 0 comma negative 12 and 6 comma 0 d. line through the points 0 comma 12 and 6 comma 0
Answers: 1
question
Mathematics, 21.06.2019 22:00
Thanh and her crew are building a stage in the shape of a trapezoid for an upcoming festival. the lengths of the parallel sides of the trapezoid are 14 ft and 24 ft. the height of the trapezoid is 12 ft.what is the area of the stage? enter your answer in the box. ft²
Answers: 2
You know the right answer?
An architect designing a bridge provides the recommendation that the builders hire 3 workers for eve...
Questions
question
Advanced Placement (AP), 22.02.2021 02:50
question
Mathematics, 22.02.2021 02:50
question
Mathematics, 22.02.2021 02:50