Mathematics, 20.04.2021 07:50 croxy0514
A team of workers took 245.6 hours to complete a task. A smaller team of
workers will complete the same task, but it will take them 1.75 times as long
as it took the first team.
Based on this information, which statement is true?
A. The task will take the smaller team of workers 247.35 hours to complete
because 245.6+ 1.75 = 247.35.
B. The task will take the smaller team of workers 279.85 hours to complete
because 245.6+ 1.75 = 279.85.
C. The task will take the smaller team of workers 498.825 hours to complete
because 245.6x 1.75 = 498.825.
D. The task will take the smaller team of workers 429.8 hours to complete
because 245.6x 1.75 = 429.8.
Help me Pls!!which one? ​
Answers: 3
Mathematics, 21.06.2019 22:10
Aadc is formed by reflecting aabc across line segment ac, as shown in the figure. if the length of ac is 4 units, the area of aadc is square units.
Answers: 3
Mathematics, 21.06.2019 23:00
The areas of two similar triangles are 72dm2 and 50dm2. the sum of their perimeters is 226dm. what is the perimeter of each of these triangles?
Answers: 1
Mathematics, 21.06.2019 23:20
For which pairs of functions is (f•g)(x)=12x? f(x)=3-4x and g(x)=16x-3 f(x)=6x2 and g(x)= 2/x f(x)= and g(x) = 144x f(x)=4x and g(x) =3x
Answers: 1
Mathematics, 22.06.2019 01:40
Jeremy wants to determine the number of solutions for the equation below without actually solving the equation.
Answers: 1
A team of workers took 245.6 hours to complete a task. A smaller team of
workers will complete the...
Business, 05.07.2019 20:50
English, 05.07.2019 20:50
Geography, 05.07.2019 20:50
Social Studies, 05.07.2019 20:50