subject
Mathematics, 30.12.2019 00:31 ShlomoShekelstein

Amachine factory produces 2 parts per second. one shift is 10 hours long. what is the production rate in parts per shift?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 23:00
Given the expression (7 ? 4i) ? (2 + 6i), perform the indicated operation and write the answer in the form a + bi.
Answers: 1
question
Mathematics, 21.06.2019 23:00
Which of the following graphs could represent a cubic function?
Answers: 1
question
Mathematics, 22.06.2019 00:20
Match the following reasons with the statements given to create the proof. 1. do = ob, ao = oc sas 2. doc = aob given 3. triangle cod congruent to triangle aob vertical angles are equal. 4. 1 = 2, ab = dc if two sides = and ||, then a parallelogram. 5. ab||dc if alternate interior angles =, then lines parallel. 6. abcd is a parallelogram cpcte
Answers: 2
question
Mathematics, 22.06.2019 02:00
Keith runs 5 miles in 38 minutes. at the same rate, how many miles would he run in 57 minutes
Answers: 1
You know the right answer?
Amachine factory produces 2 parts per second. one shift is 10 hours long. what is the production rat...
Questions
question
Mathematics, 03.06.2020 22:59
question
Law, 03.06.2020 22:59
question
Mathematics, 03.06.2020 22:59
question
Mathematics, 03.06.2020 22:59
question
Mathematics, 03.06.2020 22:59
question
English, 03.06.2020 22:59
question
Mathematics, 03.06.2020 22:59