Mathematics, 14.10.2019 01:50 sidneydominguez2323
Jean and mark are going to fill a pool with 2 different sized hoses. jean can fill the pool in 8 hours, while mark can complete it in 12 hours. their supervisor thinks that the job will take 10 hours to complete if they work together. explain each step in solving this equation, and determine if the supervisor is correct or not.
Answers: 2
Mathematics, 21.06.2019 20:00
Credit card a offers an introductory apr of 3.4% for the first three months and standard apr of 15.7% thereafter,
Answers: 3
Mathematics, 22.06.2019 00:30
One positive integer is 2 less than another. the product of the two integers is 24. what are the integers
Answers: 1
Mathematics, 22.06.2019 00:30
Triangle abc has side lengths: ab = 3.5 cm, bc = 2.4 cm, and ac = 4.2 cmδabc ≅ δhjkwhat is the length of side hj?
Answers: 1
Mathematics, 22.06.2019 00:40
Can you divide 25 into 4 equal groups? explain why or why not.
Answers: 1
Jean and mark are going to fill a pool with 2 different sized hoses. jean can fill the pool in 8 hou...
Mathematics, 27.10.2020 18:40
Medicine, 27.10.2020 18:40
Biology, 27.10.2020 18:40
Biology, 27.10.2020 18:40
History, 27.10.2020 18:40
Mathematics, 27.10.2020 18:40
History, 27.10.2020 18:40
Mathematics, 27.10.2020 18:40
Mathematics, 27.10.2020 18:40
History, 27.10.2020 18:40
Mathematics, 27.10.2020 18:40
History, 27.10.2020 18:40