subject
Mathematics, 10.12.2019 01:31 jhonnysoriano9053

Need steps to; the number 60 is 40% of ?

an assignment is completed by 32 clerks in 22 days. assuming that all the clerks work at the rate of speed, the number of clerks that would be needed to complete this assignment in 16 days is?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Lindsay is creating a bridge out of dried pasta and glue. in her plans, she sketches the graph to determine the lengths of the noodles, in centimeters, needed for the arch to increase the length of the bridge in 1 centimeter increments.which function did lindsay use to create her design? f(x) = (x – 5)2 + 8 f(x) = –(x + 5)2 + 8 f(x) = 0.5(x + 5)2 + 8 f(x) = –0.5(x – 5)2 + 8
Answers: 1
question
Mathematics, 21.06.2019 22:30
The area of a circle is equal to 1 dm². find the radius of the circle.
Answers: 1
question
Mathematics, 21.06.2019 23:00
Asporting good store is offering 30 percent off of the original price(x) of football cleats. the discount will be reduced by an another $7 before sales tax.
Answers: 1
question
Mathematics, 21.06.2019 23:00
Jane’s favorite fruit punch consists of pear, pineapple, and plum juices in the ratio 5: 2: 3. chapter reference how much punch can she make if she has only 6 cups of plum juice?
Answers: 1
You know the right answer?
Need steps to; the number 60 is 40% of ?

an assignment is completed by 32 clerks in 22...
Questions
question
Mathematics, 15.11.2020 18:00
question
Mathematics, 15.11.2020 18:10
question
Mathematics, 15.11.2020 18:10