subject
Mathematics, 26.09.2019 06:30 kaitie60

Eric and his crew have 50 trees to plant in 8 hours today they planted 40 trees. if they work at the same rate tomorrow how long will it take to finish planting the trees

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:20
The fraction of defective integrated circuits produced in a photolithography process is being studied. a random sample of 300 circuits is tested, revealing 17 defectives. (a) calculate a 95% two-sided confidence interval on the fraction of defective circuits produced by this particular tool. round the answers to 4 decimal places. less-than-or-equal-to p less-than-or-equal-to (b) calculate a 95% upper confidence bound on the fraction of defective circuits. round the answer to 4 decimal places. p less-than-or-equal-to
Answers: 3
question
Mathematics, 21.06.2019 20:30
Venita is sewing new curtains. the table below shows the relationship between the number of stitches in a row and the length ofthe row.sewingnumber of stitches length (cm)51 131532024306what is the relationship between the number of stitches and the length? othe number of stitches istimes the length.o. the number of stitches is 3 times the length.
Answers: 2
question
Mathematics, 21.06.2019 22:10
Jayne is studying urban planning and finds that her town is decreasing in population by 3% each year. the population of her town is changing by a constant rate.true or false?
Answers: 1
question
Mathematics, 22.06.2019 00:00
240 seventh graders and two-thirds of the students participate in after-school activities how many students participate in after-school activities
Answers: 1
You know the right answer?
Eric and his crew have 50 trees to plant in 8 hours today they planted 40 trees. if they work at the...
Questions
question
English, 29.03.2020 23:00
question
English, 29.03.2020 23:00