4workers require 5.5 m of mortar for 3 days when working 8 hours a day.
how much m mortar can 6 workers work by working 2 hours each 10 hours?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 20.06.2019 18:02
If tana tanb=k, show that(1+k)cos(a+b)=(1-k)cos(a-b)
Answers: 1
question
Mathematics, 21.06.2019 20:30
Martha has a deck of cards. she has lost some of the cards, and now the deck only contains nine spades, eleven diamonds, eight clubs, and twelve hearts. martha predicts that whenever she draws a card from the deck without looking, she will draw a club one-fifth of the time. which activity would best allow martha to test her prediction? a. randomly draw a card from the box and see if it is a club. b. randomly draw a card. then, continue to draw another card until all eight clubs are drawn. c. randomly draw and replace a card 120 times. then, observe how close to 30 times a club is drawn. d. randomly draw and replace a card 100 times. then, observe how close to 20 times a club is drawn.
Answers: 3
question
Mathematics, 22.06.2019 00:00
If 7x=9y, y/z = 7/5 , then x/z = (a) 2/7 (b) 7/9 (c) 9/5 (d) 9/7 (e) 5/9
Answers: 1
question
Mathematics, 22.06.2019 00:30
(c) a vine called the mile-a-minute weed is known for growing at a very fast rate. it can grow up to 0.5 ft per day. how fast in inches per hour can the mile-a-minute weed grow up to? show your work using the correct conversion factors.
Answers: 1
You know the right answer?
4workers require 5.5 m of mortar for 3 days when working 8 hours a day.
how much m mortar can 6...
Questions
question
Mathematics, 19.03.2020 01:53
question
Mathematics, 19.03.2020 01:54
question
Mathematics, 19.03.2020 01:54
question
Mathematics, 19.03.2020 01:54
question
Biology, 19.03.2020 01:55
question
Mathematics, 19.03.2020 01:55
question
Mathematics, 19.03.2020 01:55