subject
Mathematics, 27.01.2020 18:31 ilovebeans25423

You work in an assembly line. the company determines that the average employ can assemble 4 radios in 90 minutes . for one shift there are 150 employees and they each work 8 hours. to determine at this rate, how many radios were assembled in the entire plant during the shift you multiply 8 by 60, divide by 90, then multiply by 4. is this correct?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Cherie measures and records the lengths and sizes of the same style of a sandal found at a shoe store. which equation can be used to determine the approximate shoe size, s, for a foot length of x inches? s = x – 2 s = 2x – 10 s = x + 6 s = 2x + 4
Answers: 3
question
Mathematics, 21.06.2019 15:30
James is playing his favorite game at the arcade. after playing the game 3 times, he has 8 tokens remaining. he initially had 20 tokens, and the game costs the same number of tokens each time. the number tt of tokens james has is a function of gg, the number of games he plays
Answers: 2
question
Mathematics, 21.06.2019 21:00
Type the correct answer in each box. use numerals instead of words. if necessary, use / fir the fraction bar(s). the graph represents the piecewise function: h
Answers: 3
question
Mathematics, 22.06.2019 02:30
Find a parametrization for the curve「and determine the work done on a particle moving along γ in r3 through the force field f: r^3--r^3'where f(x,y,z) = (1,-x,z) and (a) im (γ) is the line segment from (0,0,0) to (1,2,1) (b) im (γ) is the polygonal curve with successive vertices (1,0,0), (0,1,1), and (2,2,2) (c) im (γ) is the unit circle in the plane z = 1 with center (0,0,1) beginning and ending at (1,0,1), and starting towards (0,1,1)
Answers: 3
You know the right answer?
You work in an assembly line. the company determines that the average employ can assemble 4 radios i...
Questions
question
Mathematics, 16.10.2020 15:01
question
Social Studies, 16.10.2020 15:01