subject
Mathematics, 15.04.2021 22:50 Jocelynrichards

When building a house, the number of days required to build is inversely proportional to with the number of workers. One house was built in 132 days by 4 workers. How
many days would it take to build a similar house with 16 workers?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 21:30
Rhombus adef is inscribed into a triangle abc so that they share angle a and the vertex e lies on the side bc . what is the length of the side of the rhombus if ab=c, and ac=b.
Answers: 1
question
Mathematics, 21.06.2019 22:20
(b) suppose that consolidated power decides to use a level of significance of α = .05, and suppose a random sample of 100 temperature readings is obtained. if the sample mean of the 100 temperature readings is x⎯⎯ = 60.990, test h0 versus ha and determine whether the power plant should be shut down and the cooling system repaired. perform the hypothesis test by using a critical value and a p-value. assume σ = 5. (round your z to 2 decimal places and p-value to 4 decimal places.)
Answers: 2
question
Mathematics, 22.06.2019 00:20
Find the power set of each of these sets, where a and b are distinct elements. a) {a} b) {a, b} c) {1, 2, 3, 4} show steps
Answers: 1
question
Mathematics, 22.06.2019 00:30
How can you check that you have correctly converted frequencies to relative frequencies?
Answers: 1
You know the right answer?
When building a house, the number of days required to build is inversely proportional to with the n...
Questions
question
Mathematics, 23.11.2020 15:50
question
Mathematics, 23.11.2020 15:50
question
Mathematics, 23.11.2020 15:50
question
Mathematics, 23.11.2020 15:50
question
Social Studies, 23.11.2020 15:50