subject
Mathematics, 10.04.2021 05:10 minecraftsam2018

A clerical worker takes 4 times as long to finish a job as it does an executive secretary Working together, it takes them 6 hr to finish the job How long would it take the clerical worker working alone, to finish the job?
It would take the clerical worker hr to finish the job working alone
(Type an integer or a decimal)

Please someone help me

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Asap 25 pts + brainlest to right/best answer
Answers: 3
question
Mathematics, 21.06.2019 14:30
Select the correct answer. what is the surface area of the victory podium shown here? include all surfaces of the podium, including the bottom. a. 61.5 square feet b. 61.75 square feet c. 65.25 square feet d. 69 square feet
Answers: 2
question
Mathematics, 21.06.2019 18:00
Aman is 6 feet 3 inches tall. the top of his shadow touches a fire hydrant that is 13 feet 6 inches away. what is the angle of elevation from the base of the fire hydrant to the top of the man's head?
Answers: 2
question
Mathematics, 21.06.2019 22:00
(05.03 mc) part a: explain why the x-coordinates of the points where the graphs of the equations y = 4x and y = 2x−2 intersect are the solutions of the equation 4x = 2x−2. (4 points) part b: make tables to find the solution to 4x = 2x−2. take the integer values of x between −3 and 3. (4 points) part c: how can you solve the equation 4x = 2x−2 graphically? (2 points)
Answers: 1
You know the right answer?
A clerical worker takes 4 times as long to finish a job as it does an executive secretary Working to...
Questions
question
Mathematics, 09.03.2021 06:10
question
Mathematics, 09.03.2021 06:10