subject
Mathematics, 09.04.2021 04:40 PrincesssOfficial

A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results SampleService Life (hours) 1495500505500 2525515505515 3470480460470 If he uses upper and lower control limits of 520 and 480 hours, on what sample(s) (if any) does service life appear to be out of control

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Find the value of the variable and the length of each secant segment.
Answers: 2
question
Mathematics, 21.06.2019 19:30
If the ratio of sum of the first m and n terms of an ap is m2 : n2 , show that the ratio of its mth and nth terms is (2m − 1) : (2n − 1).
Answers: 3
question
Mathematics, 21.06.2019 22:40
Alina fully simplifies this polynomial and then writes it in standard form. xy2 – 2x2y + 3y3 – 6x2y + 4xy2 if alina wrote the last term as 3y3, which must be the first term of her polynomial in standard form? xy2 5xy2 –8x2y –2x2y
Answers: 1
question
Mathematics, 21.06.2019 23:00
How many 3/8s are in 6 plz someone tell me now
Answers: 1
You know the right answer?
A design engineer wants to construct a sample mean chart for controlling the service life of a halog...
Questions
question
Mathematics, 04.07.2019 09:00
question
Social Studies, 04.07.2019 09:00