Mathematics, 07.04.2021 01:00 yjudon37
A chimney is to be built with bricks and it must be 4 metres high. Each layer of
bricks in the chimney is 8 centimetres high and 52 bricks are used to make one layer.
a) How many bricks would the bricklayer need to make this chimney?
b) If each brick cost $1.25, what is the cost of all the bricks?
Help, please​
Answers: 2
Mathematics, 21.06.2019 15:30
Maria donates a fixed amount, a, to a charity each month. if she donates $300 in 12 months, what is the equation for a? a. a + 300 = 12 b. a × 300 = 12 c. a × 12 = 300 d. a + 12 = 300 e. a + 32 = 100
Answers: 3
Mathematics, 21.06.2019 20:10
Look at the hyperbola graphed below. the hyperbola gets very close to the red lines on the graph, but it never touches them. which term describes each of the red lines? o o o o a. asymptote b. directrix c. focus d. axis
Answers: 3
A chimney is to be built with bricks and it must be 4 metres high. Each layer of
bricks in the chim...
Chemistry, 10.09.2021 18:40
Chemistry, 10.09.2021 18:40
Mathematics, 10.09.2021 18:40
Biology, 10.09.2021 18:40
Mathematics, 10.09.2021 18:40
English, 10.09.2021 18:40
English, 10.09.2021 18:50
Mathematics, 10.09.2021 18:50