subject
Mathematics, 06.04.2021 01:40 ptrlvn01

A snack food company produces potato chips on three different production lines. Line 1 produces 20% of the total output. Line 2 produces 30% and Line 3 produces the balance. Each line is sampled periodically for quality control purposes to ensure the salt content is within the proper range. Historically 4% of Line 1's output does not meet the salt standards, 3% of Line 2's output fails to meet salt standards, and 2% of Line 3's output does not meet salt standards. Quality Control randomly selects a bag of potato chips and it did not meet salt standards. What is the probability the potato chips were produces on Line 3

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Sum is 17 and their difference is 3
Answers: 1
question
Mathematics, 21.06.2019 18:40
Offering 30 if a plus b plus c equals 68 and ab plus bc plus ca equals 1121, where a, b, and c are all prime numbers, find the value of abc. the answer is 1978 but i need an explanation on how to get that.
Answers: 3
question
Mathematics, 21.06.2019 19:00
You give a $4 tip for a meal that cost $22. approximately what percent of the bill was your tip?
Answers: 1
question
Mathematics, 22.06.2019 00:20
Which of the following is equal to the square root of the cube root of 5 ? (1 point) 5 to the power of 1 over 3 5 to the power of 1 over 6 5 to the power of 2 over 3 5 to the power of 3 over 2
Answers: 1
You know the right answer?
A snack food company produces potato chips on three different production lines. Line 1 produces 20%...
Questions
question
Mathematics, 11.01.2021 09:10