Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish? Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.

Hint:
y=mx+b (slope-intercept form)
x=time
y=distance
b=3200
Start & Finish: ??
Total length=3200ft
Left over=1700ft after 5 months of digging

help/

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
Before simplifying, how many terms are there in the expression 2x - 5y + 3 + x?
Answers: 1
question
Mathematics, 21.06.2019 19:00
15 points! write the slope-intercept form of the equation of the line through the given point with the given slope. use y-y = m(x-x) to solve. through (2,5) slope= undefined
Answers: 2
question
Mathematics, 21.06.2019 23:00
George writes the mixed number as sum and uses the distributive property 1/2.-2/5=1/2-2+2/5=1/2
Answers: 1
question
Mathematics, 21.06.2019 23:00
Agroup of three friends order a combo meal which includes two slices of pizza and a drink each drink is priced at $2.50 the combined total of $31.50 how much is the cost of a slice of pizza
Answers: 2
You know the right answer?
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers stil...
Questions
question
Mathematics, 24.04.2020 08:52
question
Mathematics, 24.04.2020 08:54
question
Mathematics, 24.04.2020 08:54
question
Mathematics, 24.04.2020 08:54