Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish? Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.

Hint:
y=mx+b (slope-intercept form)
x=time
y=distance
b=3200
Start & Finish: ??
Total length=3200ft
Left over=1700ft after 5 months of digging

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:02
Aladder that is 30 ft long needs to reach 27 ft up a building. what should the angle of the vertical be?
Answers: 3
question
Mathematics, 21.06.2019 15:00
In which figure is de bc ? a. figure 1 b. figure 2 c. figure 3 d. figure 4
Answers: 1
question
Mathematics, 21.06.2019 16:00
Svetlana's hair is 4 4 centimeters ( cm cm) long. her hair grows 1 . 5 cm 1.5cm per month. svetlana wants her hair to be less than 1 6 cm 16cm long. write an inequality to determine the number of months, m m, svetlana can allow her hair to grow so that it is less than 1 6 cm 16cm long.
Answers: 3
question
Mathematics, 21.06.2019 17:20
Researchers were interested in whether relaxation training decreases the number of headaches a person experiences. they randomly assigned 20 participants to a control group or a relaxation training group and noted the change in number of headaches each group reported from the week before training to the week after training. which statistical analysis should be performed to answer the researchers' question?
Answers: 2
You know the right answer?
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers stil...
Questions
question
Mathematics, 15.10.2019 00:00
question
Biology, 15.10.2019 00:00
question
Mathematics, 15.10.2019 00:00