A construction company has to complete a project no later than 3 months from now or there will be significant cost overruns. The manager of the construction company believes that there are four possible values for the random variable X, the number of months from now it will take to complete this project: 2, 2.5, 3, 3.5. The manager currently thinks that the probabilities of these four possibilities are in the ratio 1 to 2 and 2 to 4. That is X = 2.5 is twice as likely as X = 2, and X = 3 is twice as likely as X = 2.5 and X = 3.5 is half as likely as X = 3. 1) Find the probability distribution of X. Hint: P(X = 2) = 0.111, P(X = 3) = 0.444
2) What is the probability that this project will not be completed on time?
3) What is the expected completion time in months?
4) How much variability (in months) exists around the expected value?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Write a function that matches the description. a cosine function has a maximum of 5 and a minimum value of -5. f (r) =
Answers: 1
question
Mathematics, 21.06.2019 19:00
Which shows the correct substitution of the values a,b and c from the equation 1=-2x+3x^2+1
Answers: 1
question
Mathematics, 21.06.2019 19:00
Rob spent 25%, percent more time on his research project than he had planned. he spent an extra h hours on the project. which of the following expressions could represent the number of hours rob actually spent on the project? two answers
Answers: 1
question
Mathematics, 22.06.2019 00:00
50 will mark show all use the linear combination method to solve the system of equations. explain each step of your solution. if steps are not explained, you will not receive credit for that step. 2x+9y= -26 -3x-7y=13
Answers: 1
You know the right answer?
A construction company has to complete a project no later than 3 months from now or there will be si...
Questions
question
Computers and Technology, 13.07.2020 21:01