subject
Mathematics, 29.03.2021 21:20 ilovecatsomuchlolol

If 50000 units has an average cost of 20 and 80000 units have an average cost of 16.5. Is it mixed cost, fixed cost, semi-fixed cost or semi-variable cost?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Lindsay used two points, (x,y; ) and (+2.82), to find the equation of the line, y = mx + b, that passes through the points. y2-y, first, she used the definition of slope and determined that the value of mis x, - . given this information, which expression must represent the value of b?
Answers: 2
question
Mathematics, 21.06.2019 20:50
Write the equation in logarithmic form 8^x=64
Answers: 1
question
Mathematics, 22.06.2019 03:30
Agame has a rectangular board with an area of 44 in2. there is a square hole near the top of the game board in which you must not toss in a bean bag. the square has side lengths of 3 in. what is the probability of not tossing the bag through the hole? a)9/44 b)3/9 c)3/44 d)35/44
Answers: 2
question
Mathematics, 22.06.2019 03:30
Given that the images represent 4 steps in the construction of a line segment congruent to a given line segment, which is step 3 in the construction?
Answers: 1
You know the right answer?
If 50000 units has an average cost of 20 and 80000 units have an average cost of 16.5. Is it mixed c...
Questions
question
Business, 25.03.2021 04:30
question
Mathematics, 25.03.2021 04:40
question
Mathematics, 25.03.2021 04:40
question
Mathematics, 25.03.2021 04:40