subject
Mathematics, 26.03.2021 03:40 Jasmineos

Question: The company needs a volume of 3000 c^3 How many units would need to be produced in a day? ( NOTICE the Volume is not V(x) it is just V in the equation.)


Question: The company needs a volume of 3000 c^3 How many units would need to be produced in a day?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Factor. 8x2y2 – 4x2y – 12xy 4(8x2y2 – x – 12xy) 4(2xy – 4x2y – 12xy) 4x2y2(2xy – xy –3) 4xy(2xy – x – 3)
Answers: 2
question
Mathematics, 21.06.2019 16:00
Consider the reaction 2x2y2+z2β‡Œ2x2y2z which has a rate law of rate= k[x2y2][z2] select a possible mechanism for the reaction.
Answers: 2
question
Mathematics, 21.06.2019 17:10
The average number of vehicles waiting in line to enter a parking lot can be modeled by the function f left parenthesis x right x squared over 2 left parenthesis 1 minus x right parenthesis endfraction , where x is a number between 0 and 1 known as the traffic intensity. find the rate of change of the number of vehicles waiting with respect to the traffic intensity for the intensities (a) xequals0.3 and (b) xequals0.6.
Answers: 1
question
Mathematics, 21.06.2019 20:30
Acompany produces packets of soap powder labeled β€œgiant size 32 ounces.” the actual weight of soap powder in such a box has a normal distribution with a mean of 33 oz and a standard deviation of 0.7 oz. to avoid having dissatisfied customers, the company says a box of soap is considered underweight if it weighs less than 32 oz. to avoid losing money, it labels the top 5% (the heaviest 5%) overweight. how heavy does a box have to be for it to be labeled overweight?
Answers: 3
You know the right answer?
Question: The company needs a volume of 3000 c^3 How many units would need to be produced in a day?...
Questions