subject
Mathematics, 23.03.2021 22:20 chloegrider6713

The fixed costs of manufacturing basketballs in a factory are $1,400.00 per day. The variable costs are $5.25per basketball. Which of the following expressions can be used to model the
cost of manufacturing b basketballs in 1 day?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Twice the sum of a number and 4 is equal to three times the difference of the number and 7. find the number.
Answers: 1
question
Mathematics, 21.06.2019 19:00
Solve the problem. a student earned grades of c, a, b, and a in four different courses. those courses had these corresponding numbers of credit hours: 4, 5, 1, and 5. the grading system assigns quality points to letter grades as follows: a = 4, b = 3, c = 2, d = 1, and f = 0. compute the grade point average (gpa) and round the result to two decimal places. 3.40 3.50 8.75 2.18
Answers: 1
question
Mathematics, 21.06.2019 20:50
An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the standard deviation of completion times is 1.6 minutes. it is claimed that, under new management, the mean completion time has decreased. to test this claim, a random sample of 33 completion times under new management was taken. the sample had a mean of 11.2 minutes. assume that the population is normally distributed. can we support, at the 0.05 level of significance, the claim that the mean completion time has decreased under new management? assume that the standard deviation of completion times has not changed.
Answers: 3
question
Mathematics, 21.06.2019 23:20
Write the equations in logarithmic form 10^3=1,000
Answers: 1
You know the right answer?
The fixed costs of manufacturing basketballs in a factory are $1,400.00 per day. The variable costs...
Questions
question
English, 29.10.2020 21:20
question
Mathematics, 29.10.2020 21:20
question
Mathematics, 29.10.2020 21:20
question
English, 29.10.2020 21:20