subject
Mathematics, 19.03.2021 19:20 bks53

Consider a simple two-stage assembly line that has two identical robot arms (one for each stage).The system is functioning if a part can receive processing (i. e. the robot arm is working) in bothstages of an assembly line. Your supervisor knows that a pure series system is not the most reliable and has authorized the purchase of two additional arms to be used to add redundancy to the system. However, she is unsure of the best way to set up the additional components to maximize system reliability. There are two options being considered: 1. Put an additional arm in each stage so that the arms in a single stage operate in parallel.
2. Set up an additional two-stage assembly line that will operate in parallel with the original line. Assume the individual component reliability for all 4 arms is R.

a. What is the system reliability of the first option in terms of R?
b. What is the system reliability of the second option in terms of R?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Is the orthocenter of a triangle on the inside ?
Answers: 2
question
Mathematics, 21.06.2019 19:00
What numbers are included in the set of integers? what numbers are not included?
Answers: 2
question
Mathematics, 21.06.2019 19:30
Given a: b and b: c, find a: b: c. write the ratio in simplest form. a: b=6: 10 and b: c=21: 33
Answers: 1
question
Mathematics, 21.06.2019 22:00
In dire need~! describe how to use area models to find the quotient 2/3 divided by 1/5. check your work by also finding the quotient 2/3 divided by 1/5 using numerical operations only.
Answers: 1
You know the right answer?
Consider a simple two-stage assembly line that has two identical robot arms (one for each stage).The...
Questions
question
Mathematics, 09.02.2022 01:00
question
Mathematics, 09.02.2022 01:00