Mathematics, 18.03.2021 22:50 holmesleauja
a manufacturer of ski clothing makes ski pants and ski jackets. the profit on a pair of ski pants is $35 and on a jacket is $15. both pants and jackets require the work of seving operators and cutters. there are 60 minutes of sewing operator time and 48 minutes of cutter time available. it takes 8 minutes to sew one pair of ski pants and 4 minutes to sew one jacket. cutters take 4 minutes on pants and 8 minutes on a jacket. the manufacturer wants to make a minimum of 4 ski pants and 2 ski jackets.
Answers: 3
Mathematics, 21.06.2019 12:30
(note i put the graph in so plz )the graph shows the amount of water that remains in a barrel after it begins to leak. the variable x represents the number of days that have passed since the barrel was filled, and y represents the number of gallons of water that remain in the barrel. what is the slope of the line
Answers: 1
Mathematics, 21.06.2019 18:10
Which of these sequences is a geometric sequence a 1,2,4, 7, 11, 16, 22. b. 2.4.8.14.22.38 c.3.6.9. 15.18,21 d. 3,9,27,81,243,729,
Answers: 1
a manufacturer of ski clothing makes ski pants and ski jackets. the profit on a pair of ski pants is...
Mathematics, 28.02.2021 09:40
Mathematics, 28.02.2021 09:40
Mathematics, 28.02.2021 09:40
Mathematics, 28.02.2021 09:40
Mathematics, 28.02.2021 09:40
Mathematics, 28.02.2021 09:40
Mathematics, 28.02.2021 09:40
Business, 28.02.2021 09:40
Mathematics, 28.02.2021 09:40