subject
Mathematics, 18.03.2021 06:40 drippyyahja

Tony calculates that 3 cubic metres of concrete is enough for the path. He decides to use a concrete mix which has: cement = 1 part sand = 2 parts gravel = 3 parts How many cubic metres of gravel does Tony need?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
The amount of money, in dollars, in an account after t years is given by a = 1000(1.03)^t. the initial deposit into the account was $_^a0 and the interest rate was _a1% per year. only enter numbers in the boxes. do not include any commas or decimal points^t. the initial deposit into the account was $__^a0 and the interest rate is % per year.
Answers: 2
question
Mathematics, 21.06.2019 15:30
Which triangle congruence postulate or theorem justifies my claim that the steps i made using construction paper and scissors produce an isosceles triangle? was it sss, sas, asa, aas, or hl?
Answers: 2
question
Mathematics, 21.06.2019 19:50
Solve the equation by completing the square. x^2+2x=17
Answers: 2
question
Mathematics, 21.06.2019 20:40
David estimated he had about 20 fish in his pond. a year later, there were about 1.5 times as many fish. the year after that, the number of fish increased by a factor of 1.5 again. the number of fish is modeled by f(x)=20(1.5)^x. create a question you could ask that could be answered only by graphing or using a logarithm.
Answers: 1
You know the right answer?
Tony calculates that 3 cubic metres of concrete is enough for the path. He decides to use a concrete...
Questions
question
Mathematics, 19.06.2020 08:57
question
Health, 19.06.2020 08:57
question
English, 19.06.2020 08:57