Mathematics, 18.03.2021 01:50 jahzz

The expected activity time in PERT analysis is calculated as: the weighted average of a, m, and b, with m weighted 4 times as heavily as a and b. the sum of the optimistic, pessimistic, and most likely times, divided by six. the simple average of the optimistic, pessimistic, and most likely times. the sum of the activity variances, divided by six. the sum of the optimistic, pessimistic, and most likely times.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
The diameter of a circular chip is doubled to use in a new board game. the area of the new chip will be
Answers: 2
question
Mathematics, 21.06.2019 18:00
Describe the relationship between the angles of similar triangles and the sides of similar triangles
Answers: 1
question
Mathematics, 21.06.2019 18:30
Which of the following is the result of expanding
Answers: 2
question
Mathematics, 21.06.2019 20:00
Maurice has 54 fewer comic books than rebecca.they have 130 comic books together .how many comic books are in maurices collection ? how many comic books are in rebeccas collection
Answers: 1
You know the right answer?
The expected activity time in PERT analysis is calculated as: the weighted average of a, m, and b, w...
Questions
question
Mathematics, 07.10.2020 22:01