subject
Mathematics, 18.03.2021 01:20 zahradawkins2007

DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Month
1 2 3 4
Throughput time (days) ? ? ? ?
Delivery cycle time (days) ? ? ? ?
Manufacturing cycle efficiency (MCE) ? ? ? ?
Percentage of on-time deliveries 78 % 73 % 70 % 67 %
Total sales (units) 2330 2230 2116 2036
Management has asked for your help in computing throughput time, delivery cycle time, and MCE. The following average times have been logged over the last four months:
Average per Month (in days)
1 2 3 4
Move time per unit 0.8 0.4 0.5 0.5
Process time per unit 3.4 3.2 3.0 2.8
Wait time per order before start of production 23.0 25.2 30.0 32.3
Queue time per unit 4.3 5.1 6.0 7.0
Inspection time per unit 0.6 0.9 0.9 0.6
Required:
1-a. Compute the throughput time for each month.
1-b. Compute the delivery cycle time for each month.
1-c. Compute the manufacturing cycle efficiency (MCE) for each month.
2. Evaluate the company’s performance over the last four months.
3-a. Refer to the move time, process time, and so forth, given for month 4. Assume that in month 5 the move time, process time, and so forth, are the same as in month 4, except that through the use of Lean Production the company is able to completely eliminate the queue time during production. Compute the new throughput time and MCE.
3-b. Refer to the move time, process time, and so forth, given for month 4. Assume in month 6 that the move time, process time, and so forth, are again the same as in month 4, except that the company is able to completely eliminate both the queue time during production and the inspection time. Compute the new throughput time and MCE.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
The graph shown is the graph of which function?
Answers: 2
question
Mathematics, 21.06.2019 22:00
What value is a discontinuity of x squared plus 8 x plus 4, all over x squared minus x minus 6?
Answers: 2
question
Mathematics, 22.06.2019 00:20
The police chief wants to know if the city’s african americans feel that the police are doing a good job. identify the management problem (i.e dependent variable) and identify the independent variable.
Answers: 1
question
Mathematics, 22.06.2019 02:00
Which of the following is a cost homeowners insurance does not protect? a. the cost of repair or replacement of a home lost in a natural disaster. b. additional living expenses required while your home is repaired after a disaster. c. replacement costs for all contents in your home, including high cost electronics. d. the cost of medical expenses incurred by somebody getting injured on your property. select the best answer from the choices provided
Answers: 3
You know the right answer?
DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufa...
Questions
question
Geography, 17.03.2020 22:25
question
Geography, 17.03.2020 22:25
question
Chemistry, 17.03.2020 22:25