Mathematics, 13.03.2021 01:00 tonhill6923

working 8 hours a day, 48 men can complete a job in 1 week. how many men working 6 hours a day will complete the same job in 16 days?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:40
Which point on the x-axis lies on the line that passes through point c and is parallel to lino ab?
Answers: 1
question
Mathematics, 21.06.2019 15:40
Each of the walls of a room with square dimensions has been built with two pieces of sheetrock, a smaller one and a larger one. the length of all the smaller ones is the same and is stored in the variable small. similarly, the length of all the larger ones is the same and is stored in the variable large. write a single expression whose value is the total area of this room. do not use any method invocations.
Answers: 1
question
Mathematics, 22.06.2019 00:30
Round each of the decimals to the nearest hundredth a. 0.596 b. 4.245 c. 53.6843 d. 17.999
Answers: 2
question
Mathematics, 22.06.2019 00:30
The water company charges a residential customer $41 for the first 3,000 gallons of water used and $1 for every 200 gallons used over 3000 gallons. if the water bill was $58 how many gallons of water were usedanswersa 3400 gallonsb 6000 gallonsc 6400 gallons d 7000 gallons
Answers: 2
You know the right answer?
working 8 hours a day, 48 men can complete a job in 1 week. how many men working 6 hours a day will...
Questions
question
Mathematics, 01.03.2021 20:50
question
Geography, 01.03.2021 20:50