subject
Mathematics, 09.03.2021 01:00 natalie2sheffield

What is the linear function equation that best fits the data set? yˆ=−3x+15

yˆ=−43x+9

yˆ=−43x+10

yˆ=3x+15
Scatter plot with horizontal x-axis ranging from 0 to 15 in increments of 1 and vertical y-axis ranging from 0 to 15 in increments of 1. Eight points are scattered in the linear pattern that falls from top to bottom of the line. The first point is located at begin ordered pair 1 comma 12 end ordered pair. Second point is located at begin ordered pair 1.5 comma 8 end ordered pair. Third point is located at begin ordered pair 1.5 comma 14 end ordered pair. Fourth point is located at begin ordered pair 2 comma 9 end ordered pair. Fifth point is located at begin ordered pair 3 comma 6 end ordered pair. Sixth point is located at begin ordered pair 4 comma 3 end ordered pair. Seventh point is located at begin ordered pair 4.5 comma 4 end ordered pair. Eighth point is located at begin ordered pair 4.5 comma 0 end ordered pair.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
Kapil needed to buy a long wooden beam. he went to two sawmills that each charge an initial fee plus an additional fee for each meter of wood. the following equation gives the price (in dollars) of a wooden beam from the first sawmill as a function of its length (in meters). p = 5+20xp=5+20x
Answers: 1
question
Mathematics, 21.06.2019 18:00
The given dot plot represents the average daily temperatures, in degrees fahrenheit, recorded in a town during the first 15 days of september. if the dot plot is converted to a box plot, the first quartile would be drawn at __ , and the third quartile would be drawn at __ link to graph: .
Answers: 1
question
Mathematics, 21.06.2019 19:00
You give a $4 tip for a meal that cost $22. approximately what percent of the bill was your tip?
Answers: 1
question
Mathematics, 21.06.2019 20:50
An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the standard deviation of completion times is 1.6 minutes. it is claimed that, under new management, the mean completion time has decreased. to test this claim, a random sample of 33 completion times under new management was taken. the sample had a mean of 11.2 minutes. assume that the population is normally distributed. can we support, at the 0.05 level of significance, the claim that the mean completion time has decreased under new management? assume that the standard deviation of completion times has not changed.
Answers: 3
You know the right answer?
What is the linear function equation that best fits the data set? yˆ=−3x+15

yˆ=−43x+9
Questions
question
Mathematics, 30.12.2019 21:31
question
Mathematics, 30.12.2019 21:31