subject
Mathematics, 08.03.2021 22:50 miguel454545

Problem 1: Dwayne took his car to have the timing belt replaced. If the belt costs $150 and the mechanic charges $85 per hour for his labor, write an equation that relates Dwayne's total cost(t) to the number of hours (h) the mechanic works. 1. What is the beginning value or b or y-intercept?

2. What is the rate per hour or slope or m?

3. Put the two values in the equation y=


Problem 1: Dwayne took his car to have the timing belt replaced. If the belt costs $150 and the mec

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 21:00
Askateboard ramp is in the shape of a right triangle what is the height of the ramp
Answers: 3
question
Mathematics, 21.06.2019 23:00
Could someone me with this question i’ve been stuck on it for 20 minutes
Answers: 1
question
Mathematics, 22.06.2019 03:30
Astudent solves the equation for v. start with the original equation. use the square root property. use the division property of equality. use the multiplication property of equality. simplify. which statement explains how to correct the error that was made? the square root property must be applied after all other properties of equality are applied. the multiplication property of equality should have been applied before the division property of equality. the division property of equality should have been applied to move the fraction to the other side of the equation. the square root property should have been applied to both complete sides of the equation instead of to select variables.
Answers: 1
question
Mathematics, 22.06.2019 04:30
Acone with radius 5 cm and height 12 cm how many cm ?
Answers: 1
You know the right answer?
Problem 1: Dwayne took his car to have the timing belt replaced. If the belt costs $150 and the mech...
Questions
question
History, 12.09.2019 01:10
question
Advanced Placement (AP), 12.09.2019 01:10
question
Mathematics, 12.09.2019 01:10
question
Mathematics, 12.09.2019 01:10