subject
Mathematics, 23.02.2021 18:00 ladybug9014

Sabe-se que 4 máquinas operando 8 horas por dia, durante 5 dias, produzem 8 toneladas de certo produto. Quantas toneladas, do mesmo produto, seriam produzidas por 6 máquinas daquele tipo,

operando 4 horas por dia, durante 6 dias?

(A) 7,2

(B) 8,5

(C) 9,4

(D)10,5

(E) 12,3​

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:10
To find the extreme values of a function f(x.y) on a curve x-x(t), y y(t), treat f as a function of the single variable t and use the chain rule to find where df/dt is zero. in any other single-variable case, the extreme values of f are then found among the values at the critical points (points where df/dt is zero or fails to exist), and endpoints of the parameter domain. find the absolute maximum and minimum values of the following function on the given curves. use the parametric equations x=2cos t, y 2 sin t functions: curves: i) the semicircle x4,y20 i) the quarter circle x2+y-4, x20, y20 b, g(x,y)=xy
Answers: 2
question
Mathematics, 21.06.2019 16:30
Hi my sisters and brothers can tell me the answer because i don’t understand the question
Answers: 1
question
Mathematics, 21.06.2019 20:40
In a 45-45-90 right triangle, what is the ratio of the length of one leg to the length of the other leg? а . 1: 2 в. 2: 1 с. 2: 1 d. 1: 1
Answers: 1
question
Mathematics, 21.06.2019 23:30
The volume of a box varies directly with its length if a box in the group has a length of 30inches and k=24 what is its volume
Answers: 1
You know the right answer?
Sabe-se que 4 máquinas operando 8 horas por dia, durante 5 dias, produzem 8 toneladas de certo prod...
Questions
question
Mathematics, 27.11.2020 21:00