subject
Mathematics, 19.02.2021 14:00 brooklyn674

A construction worker pulls a five-meter plank up the side of a building under construction by means of a rope tied to one end of the plank (see figure). Assume the opposite end of the plank follows a path perpendicular to the wall of the building and the worker pulls the rope at a rate of 0.26 meter per second. How fast is the end of the plank sliding along the ground when it is 1.2 meters from the wall of the building? (Round your answer to two decimal places.)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 22:10
Gravel is being dumped from a conveyor belt at a rate of 25 ft3/min, and its coarseness is such that it forms a pile in the shape of a cone whose base diameter and height are always equal. how fast is the height of the pile increasing when the pile is 14 ft high? (round your answer to two decimal places.) ft/min
Answers: 3
question
Mathematics, 22.06.2019 01:00
First work with stencil one. use a combination of reflections, rotations, and translations to see whether stencil one will overlap with the original pattern. list the sequence of rigid transformations you used in your attempt, noting the type of transformation, the direction, the coordinates, and the displacement in
Answers: 3
question
Mathematics, 22.06.2019 04:30
What is the hypotenuse of a triangle with 4 ft and 5 ft
Answers: 1
question
Mathematics, 22.06.2019 04:50
Match each equation to the ordered pair that represents one of its solutions. 3x + 2y = 6 -5x + y = -10 x ? 4y = 8 -6x ? 5y = 30 ordered pair equation (0, -6) arrowboth (0, 3) arrowboth (4, -1) arrowboth (1, -5) arrowboth reset next unit 2 - pretest
Answers: 3
You know the right answer?
A construction worker pulls a five-meter plank up the side of a building under construction by means...
Questions
question
Business, 02.07.2019 23:00
question
Chemistry, 02.07.2019 23:00
question
Mathematics, 02.07.2019 23:00