subject
Mathematics, 16.02.2021 23:40 eyanil17

You are responsible for assigning the staffing for a
sort at CLE5 and your goal is
to scan as many packages to
pallets during a 4 hour shift
as possible with the
associates available. Your
inbound associates can
unload at 1200 pieces per
hour, your sort slide sorters
can sort at 2000 pieces per
hour, and your scanners on
the lanes all scan at 125
pieces per hour. Assume all
other indirect roles are not
needed and there are no
breaks. If you have 56
associates for the shift how
many do you staff in each
department, what is your
TPH (throughput per labor
hour), and total units
processed during the shift?
EL

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:10
What is the area of triangle abc if a = 8, b = 11, and c = 15?
Answers: 1
question
Mathematics, 21.06.2019 17:30
If the speed of an electromagnetic wave is 100,000 cm/s and its wavelength is 100 cm, what is its frequency? a) 100,000 cycles per second (hz) b) 1 × 10-3 cycles per second (hz) c) 10,000,000 cycles per second (hz) d) 1,000 cycles per second (hz)
Answers: 1
question
Mathematics, 21.06.2019 21:30
Item 1 solve for s. s+24=90 −114 −66 66 114
Answers: 2
question
Mathematics, 21.06.2019 22:00
Find an bif a = {3, 6, 9, 12) and b = {2, 4, 6, 8, 10).
Answers: 1
You know the right answer?
You are responsible for assigning the staffing for a
sort at CLE5 and your goal is
to s...
Questions
question
World Languages, 03.06.2021 01:50
question
Mathematics, 03.06.2021 01:50