subject
Mathematics, 16.02.2021 21:00 cnejcnefjvefven47

A construction crew needs to pave a road that is 206 miles long. The crew paves 9 miles of the road each day. The length, L (in miles), that is left to be paved after d days is given by the following function


A construction crew needs to pave a road that is 206 miles long. The crew paves 9 miles of the road

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:20
Which equation can be used to solve for the unknown number? seven less than a number is thirteen. n-7=13 7-n=13 n+7=13 n+13=7
Answers: 1
question
Mathematics, 21.06.2019 14:00
Find x & pleeeeaaaassseeee me !
Answers: 1
question
Mathematics, 21.06.2019 19:30
Awater holding tank measures 105 m long, 50 m wide, and 8 m deep. traces of mercury have been found in the tank, with a concen- tration of 60 mg/l. what is the total mass of mercury in the tank? answer in units of kg.
Answers: 1
question
Mathematics, 21.06.2019 21:30
Find the ratios of the corresponding sides
Answers: 2
You know the right answer?
A construction crew needs to pave a road that is 206 miles long. The crew paves 9 miles of the road...
Questions
question
Mathematics, 03.02.2020 22:01
question
Mathematics, 03.02.2020 22:01
question
Mathematics, 03.02.2020 22:02