A front-end loader is to load trucks with granular material that has a swell factor of 15%. If the loader has a heaped capacity of 10 cu. yd., calculate the total cycle time for the loader if it can move 55 cu. yd. of in-bank material in 1 hr. with an efficiency of 48 min./hr.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
You’re giving a cube with a length of 2.5 cm and a width of 2.5 cm and a high of 2.5 cm you place it on a scale and it is 295 g calculate the density
Answers: 1
question
Mathematics, 21.06.2019 21:10
What is the domain of the given function? {(3,-2), (6, 1), (-1, 4), (5,9), (-4, 0); o {x | x= -4,-1, 3, 5, 6} o {yl y = -2,0, 1,4,9} o {x|x = -4,-2, -1,0, 1, 3, 4, 5, 6, 9} o y y = 4,-2, -1, 0, 1, 3, 4, 5, 6, 9}
Answers: 1
question
Mathematics, 21.06.2019 22:00
Asquare and an equilateral triangle have the same perimeter. each side the triangle is 4 inches longer than each side of the square. what is the perimeter of the square
Answers: 1
question
Mathematics, 21.06.2019 23:30
Consider the first four terms of the sequence below. what is the 8th term of this sequence?
Answers: 1
You know the right answer?
A front-end loader is to load trucks with granular material that has a swell factor of 15%. If the l...
Questions
question
English, 29.03.2021 09:10