subject
Mathematics, 11.11.2019 09:31 hubs14

Avenue manager has a target labor cost of 20% of revenue. he expects revenue to be $725,000. what is his target for labor?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Negative 5 1/12 + negative 4 1/4 + 6 3/4
Answers: 1
question
Mathematics, 21.06.2019 19:00
Billy plotted −3 4 and −1 4 on a number line to determine that −3 4 is smaller than −1 4 .is he correct? explain why or why not
Answers: 3
question
Mathematics, 21.06.2019 19:40
Afactory makes propeller drive shafts for ships. a quality assurance engineer at the factory needs to estimate the true mean length of the shafts. she randomly selects four drive shafts made at the factory, measures their lengths, and finds their sample mean to be 1000 mm. the lengths are known to follow a normal distribution whose standard deviation is 2 mm. calculate a 95% confidence interval for the true mean length of the shafts. input your answers for the margin of error, lower bound, and upper bound.
Answers: 3
question
Mathematics, 21.06.2019 20:30
On a cm grid, point p has coordinates (3,-1) and point q has coordinates (-5,6) calculate the shortest distance between p and q give your answer to 1 decimal place
Answers: 2
You know the right answer?
Avenue manager has a target labor cost of 20% of revenue. he expects revenue to be $725,000. what is...
Questions
question
Geography, 12.10.2020 22:01
question
Mathematics, 12.10.2020 22:01
question
Mathematics, 12.10.2020 22:01
question
Mathematics, 12.10.2020 22:01
question
Mathematics, 12.10.2020 22:01
question
Business, 12.10.2020 22:01