subject
Mathematics, 05.02.2021 21:30 lukelara

When building a house, the number of days required to build is inversely proportional to with the number of workers. One house was built in 147 days by 4 workers. How many days would it take to build a similar house with 42 workers?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Martin likes to make flower bouquets that have 3 daffodils and 4 tulips per vase. a daffodil has a mass of d grams, a tulip has a mass of t grams, and the vase has a mass of u grams. the expression 5(3d + 4t + v) describes the mass of 5 bouquets. match each amount in the situation with the expression that represents it. situation expression number of bouquets mass of one bouquet mass of the tulips in one bouquet 4t mass of the daffodils in one bouquet 3d + 4t + v
Answers: 2
question
Mathematics, 21.06.2019 19:30
Now max recorded the heights of 500 male humans. he found that the heights were normally distributed around a mean of 177 centimeters. which statements about max’s data must be true? a) the median of max’s data is 250 b) more than half of the data points max recorded were 177 centimeters. c) a data point chosen at random is as likely to be above the mean as it is to be below the mean. d) every height within three standard deviations of the mean is equally likely to be chosen if a data point is selected at random.
Answers: 1
question
Mathematics, 21.06.2019 23:00
Solve for x: 5/3 x = 20/21 it's fraction. remember to simplify your fraction
Answers: 2
question
Mathematics, 21.06.2019 23:40
The bolo cavern outside of vandalia is 421 ft below sea level. a little more than75 miles away. mt owens is 7295 feet above sea level. what is the difference in elevation between the bolo cavern and mt owens?
Answers: 1
You know the right answer?
When building a house, the number of days required to build is inversely proportional to with the nu...
Questions
question
Mathematics, 02.11.2020 20:30
question
Mathematics, 02.11.2020 20:30