subject
Mathematics, 05.02.2021 19:50 thedocgalloway

A factory process requires 3 steps to finish a product. The steps each have a mean completion time of A= 10 seconds and a standard deviation of o = 5 seconds. The time it takes to complete each step is independent from the other steps. Let T be the total completion time for the 3 steps. Find the standard deviation of T.

Choose 1

OT = 15 seconds

Or = 75 seconds

or 15 seconds

or = v75 seconds

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:10
Marcus needs to rewrite f(x) = x2 + 6x + 4 in vertex form.
Answers: 1
question
Mathematics, 21.06.2019 19:00
Eis the midpoint of line segment ac and bd also line segment ed is congruent to ec prove that line segment ae is congruent to line segment be
Answers: 3
question
Mathematics, 21.06.2019 19:00
1) what is the measure of the exterior angle, ∠uvw ? 2) in triangle man, what is the measure of the exterior angle at n (in degrees)?
Answers: 1
question
Mathematics, 21.06.2019 20:00
Elizabeth is using a sample to study american alligators. she plots the lengths of their tails against their total lengths to find the relationship between the two attributes. which point is an outlier in this data set?
Answers: 1
You know the right answer?
A factory process requires 3 steps to finish a product. The steps each have a mean completion time o...
Questions
question
Mathematics, 22.09.2021 01:20
question
Mathematics, 22.09.2021 01:30