subject
Mathematics, 05.02.2021 03:10 tamarahawkins834

During construction the workers need to mix dried bentonite into the concrete as it is being mixed to get the desired consistency. The workers decide to mix 800 mg of
Bentonite to be mixed with 198 lb of concrete mix every 8 hours. The information for the
concrete shows that 25-75 mg/kg per day is the appropriate mixture consistency. Are
the workers within the desired range? (Note: 1kg = 2.2 lbs)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Medium sodas cost $1.25 and hot dogs cost $2.50. natalie’s group brought in pizzas but is buying the drinks at concession stand. how many medium sodas can natalie’s group buy with $20? make a table to show answer.
Answers: 1
question
Mathematics, 21.06.2019 12:30
Idont get this question can someone me solve it? ** the distance light travels in one second (1 light second) is about 1.86 ×10^5 mi. saturn is about 475 light-seconds from the sun. about how many miles from the sun is saturn..my guess is 8.83* 10^7 you so much
Answers: 1
question
Mathematics, 21.06.2019 17:00
Find the value of the variable and the length of each secant segment.
Answers: 1
question
Mathematics, 21.06.2019 17:20
Select a graph that have an equation with a < 0
Answers: 2
You know the right answer?
During construction the workers need to mix dried bentonite into the concrete as it is being mixed...
Questions
question
Biology, 19.09.2021 14:30
question
Physics, 19.09.2021 14:40
question
History, 19.09.2021 14:40