subject
Mathematics, 04.02.2021 06:20 onlymyworld27

Plsss. It costs a ski resort $17.25/hour to hire one front-loader operator. If the ski resort plans to hire five front-loader operators each digging at a rate of 7 cubic yard of dirt per minute
to dig 6890 cubic yards of dirt, how much in labor will it cost the ski resort?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:20
The speed of a falling object increases at a constant rate as time increases since the object was dropped. which graph could represent the relationship betweent time in seconds, and s, speed in meters per second? speed of a falling object object over time
Answers: 1
question
Mathematics, 21.06.2019 21:30
This is a map of the mars exploration rover opportunity predicted landing site on mars. the scale is 1cm : 9.4km. what are the approximate measures of the actual length and width of the ellipse? i mostly need to know how to set it up : )
Answers: 3
question
Mathematics, 21.06.2019 22:30
Abucket of paint has spilled on a tile floor. the paint flow can be expressed with the function p(t) = 6(t), where t represents time in minutes and p represents how far the paint is spreading. the flowing paint is creating a circular pattern on the tile. the area of the pattern can be expressed as a(p) = 3.14(p)^2 part a: find the area of the circle of spilled paint as a function of time, or a[p(t)]. show your work. part b: how large is the area of spilled paint after 8 minutes? you may use 3.14 to approximate pi in this problem.
Answers: 2
question
Mathematics, 22.06.2019 00:00
Ineed with the quizzes in apex mathematics ii
Answers: 1
You know the right answer?
Plsss. It costs a ski resort $17.25/hour to hire one front-loader operator. If the ski resort plans...
Questions
question
World Languages, 15.09.2021 14:00
question
Social Studies, 15.09.2021 14:00
question
Mathematics, 15.09.2021 14:00
question
English, 15.09.2021 14:00