subject
Mathematics, 23.08.2019 20:30 bqg464

Aconstruction crew needs to build a road that will be 20 miles long. the crew already completed a stretch that is 6.44 miles long and another that is 8.62 miles long. how much more road does the construction crew need to build?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
The sat and act tests use very different grading scales. the sat math scores follow a normal distribution with mean 518 and standard deviation of 118. the act math scores follow a normal distribution with mean 20.7 and standard deviation of 5. suppose regan scores a 754 on the math portion of the sat. how much would her sister veronica need to score on the math portion of the act to meet or beat regan's score?
Answers: 1
question
Mathematics, 21.06.2019 18:30
The base of a triangle is 8 1 3 meters and the height of the triangle is the fourth root of 16 meters meters. what is the area of the triangle?
Answers: 3
question
Mathematics, 21.06.2019 19:30
Atemperature of 1.64â—¦f corresponds to answer in units of â—¦c.
Answers: 1
question
Mathematics, 21.06.2019 20:30
Ateam has p points. p = 3w + d w = wins d = draws a) a football team has 5 wins and 3 draws. how many points does the team have?
Answers: 1
You know the right answer?
Aconstruction crew needs to build a road that will be 20 miles long. the crew already completed a st...
Questions
question
Mathematics, 27.06.2019 15:30
question
Mathematics, 27.06.2019 15:30
question
Mathematics, 27.06.2019 15:30