subject
Mathematics, 24.01.2021 06:30 KayPink5723

On a certain workday, the rate, in tons per hour, at which unprocessed gravel arrives at a gravel processing plant is
modeled by G(t) = 90 + 45 cos (t), where t is
measured in hours and 0 the workday (t=0), the plant has 500 tons of unprocessed
gravel. During the hours of operations, 0 plant processes gravel at a constant rate of 100 tons per
hour.
b.) Find the total amount of unprocessed gravel that
arrives at the plant during the hours of operation on this
workday.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 22:10
In which direction does the left side of the graph of this function point? a(x) = 3x - x2 + 4x - 2
Answers: 3
question
Mathematics, 21.06.2019 23:00
According to a study conducted in 2015, 18% of shoppers said that they prefer to buy generic instead of name-brand products. suppose that in a recent sample of 1500 shoppers, 315 stated that they prefer to buy generic instead of name-brand products. at a 5% significance level, can you conclude that the proportion of all shoppers who currently prefer to buy generic instead of name-brand products is higher than .18? use both the p-value and the critical-value approaches.
Answers: 1
question
Mathematics, 21.06.2019 23:20
Write the equations in logarithmic form 9^4=6,561
Answers: 1
question
Mathematics, 21.06.2019 23:30
Identify the slope an intercept of the following linear equation y = 1/5x - 6 a. slope: 1/5; intercept: -6 b. slope: 5; intercept: -6 c. slope: -1/5; intercept: 6 d. slope: 1/5; intercept: 6
Answers: 2
You know the right answer?
On a certain workday, the rate, in tons per hour, at which unprocessed gravel arrives at a gravel p...
Questions