On a certain workday, the rate, in tons per hour, at which unprocessed gravel arrives at a gravel processing plant is
modeled by G(t) = 90 + 45 cos (t), where t is
measured in hours and 0 the workday (t=0), the plant has 500 tons of unprocessed
gravel. During the hours of operations, 0 plant processes gravel at a constant rate of 100 tons per
hour.
c.) Is the unprocessed gravel at the plant increasing or
decreasing at time t=5 hours? Show the work that leads
to your answer.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Abarbecue sold 26 hamburgers and hot dogs. hamburgers sell for $3.50 each and hot dogs sell for $2.00 each. if the barbecue made $70 in sales, determine and state the number of hot dogs sold.
Answers: 1
question
Mathematics, 21.06.2019 20:00
Put the equation in slope intercept form by solving for y
Answers: 2
question
Mathematics, 21.06.2019 23:10
Point s lies between points r and t on . if rt is 10 centimeters long, what is st? 2 centimeters 4 centimeters 6 centimeters 8 centimeters
Answers: 2
question
Mathematics, 22.06.2019 00:30
For the sequence [tex]a_{n} = 2n/(n+1)[/tex], what is the value of [tex]a_{10}[/tex]
Answers: 2
You know the right answer?
On a certain workday, the rate, in tons per hour, at which unprocessed gravel arrives at a gravel p...
Questions