subject
Mathematics, 21.01.2021 22:50 pcartei

A quality control specialist at a plate glass factory must estimate the mean clarity rating of a new batch of glass sheets being produced using a sample of 18 sheets of glass. The actual distribution of this batch is unknown, but preliminary investigations show that a normal approximation is reasonable. The specialist decides to use a t- distribution rather than a z-distribution because (A) The z-distribution is not appropriate because the sample size is too small.
(B) The sample size is large compared to the population size.
(C) The data comes from only one batch.
(D) The variability of the batch is unknown.
(E) The t-distribution results in a narrower confidence interval.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
The volume of a sphere is increased by 6%. calculate the corresponding percentage increased in it area.
Answers: 3
question
Mathematics, 21.06.2019 20:30
2/3(-6y+9x) expand each expression using the distributive property
Answers: 3
question
Mathematics, 22.06.2019 00:30
Can someone me find the original price? the discount is 5% and the sale price is $68.40
Answers: 1
question
Mathematics, 22.06.2019 01:30
Talia took the bus from her home to the bank and then walked back to her home along the same route. the bus traveled at an average speed of 40 km/h and she walked at an average speed of 5 km/h. to determine the time, x, that it took talia to walk home, she used the equation 40(0.9 – x) = 5x. the time of trip 2 is hours. the distance of trip 1 is km.
Answers: 1
You know the right answer?
A quality control specialist at a plate glass factory must estimate the mean clarity rating of a new...
Questions
question
Mathematics, 05.01.2020 00:31
question
Mathematics, 05.01.2020 00:31
question
Mathematics, 05.01.2020 00:31
question
Mathematics, 05.01.2020 00:31