subject
Mathematics, 14.01.2021 20:20 tilsendt

A machine creates pipe fittings at a constant rate at a manufacturing company. During a 10-hour shift, the machine is scheduled to create 500 pipe fittings. The graph shows the remaining number of pipe fittings that need to be created during the shift as a linear function of x, the time in hours. Study the graph below...
Pipe Fittings... Total Pipe Fittings Remaining...
Time
Hours...

Which answer choice best describes the domain and range of the function for this situation?

A. Domain: {−50}
Range: {500}

A. , Domain: , negative 50, , , Range: 500 , ,

B. Domain: {500}
Range: {−50}

B. , Domain: , 500, , , Range: negative 50 , ,

C. Domain: All real numbers greater than or equal to 0 and less than or equal to 500.
Range: All real numbers greater than or equal to 0 and less than or equal to 10.

C. , Domain: All real numbers greater than or equal to 0 and less than or equal to 500., , Range: All real numbers greater than or equal to 0 and less than or equal to 10., ,

D. Domain: All real numbers greater than or equal to 0 and less than or equal to 10.
Range: All real numbers greater than or equal to 0 and less than or equal to 500.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Aplane flies around trip to philadelphia it flies to philadelphia at 220 miles per hour and back home with a tailwind at 280 miles per hour if the total trip takes 6.5 hours how many miles does the plane fly round trip
Answers: 1
question
Mathematics, 21.06.2019 17:30
Use the net as an aid to compute the surface area of the triangular prism. a) 550 m2 b) 614 m2 c) 670 m2 d) 790 m2
Answers: 1
question
Mathematics, 21.06.2019 20:30
There are 45 questions on your math exam. you answered 810 of them correctly. how many questions did you answer correctly?
Answers: 3
question
Mathematics, 22.06.2019 02:30
Graph the function =gx+2x3 and give its domain and range using interval notation.
Answers: 3
You know the right answer?
A machine creates pipe fittings at a constant rate at a manufacturing company. During a 10-hour shif...
Questions
question
Mathematics, 29.06.2019 19:00
question
Mathematics, 29.06.2019 19:00