subject
Mathematics, 14.01.2021 16:10 dmurdock1973

A surfboard manufacturer makes small and large surfboards. The production process has three stages: assembly, finish, and inspection. Each small surfboard requires 3 hours to assemble, 2 hours to finish, and 1 hour for inspection. Each large surfboard requires 4 hours to assemble, 3 hours to finish, and 1.5 hours for inspection. There are 140 hours available for assembly, 100 hours to finish, and 50 hours for inspection. The large surfboard makes $150 profit per board. The small surfboard makes $100 profit per board. Linear programming will be used to create the weekly production schedule. What would be a constraint for this problem if S

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:40
The owners of four companies competing for a contract are shown in the table below. if a report is released that advocates company b, which of the people having funded the report should result in the most skepticism? company owner of company company a jake adams company b company c company d debby smith henry rose rhonda baker o a. jake adams o b. rhonda baker o c. debby smith o d. henry rose
Answers: 2
question
Mathematics, 21.06.2019 20:00
The function models the number of accidents per 50 million miles driven as a function
Answers: 1
question
Mathematics, 21.06.2019 21:30
The table shows the number of students who signed up for different after school activities. activity students cooking 9 chess 4 photography 8 robotics 11 select the true statements about the information in the table.
Answers: 2
question
Mathematics, 22.06.2019 00:00
Apolygon is shown on the graph: a polygon is shown on the coordinate plane. vertices are located at 3 comma 5, 1 comma 3, 1 comma 1, 2 comma 0, 4 comma 0, 5 comma 1, and 5 comma 3. what effect will a translation 3 units down and 2 units left have on the polygon? be sure to address how it could impact the angles, side lengths, and congruency between the original pre-image and the image. xd i need
Answers: 3
You know the right answer?
A surfboard manufacturer makes small and large surfboards. The production process has three stages:...
Questions
question
Mathematics, 20.09.2020 14:01
question
Mathematics, 20.09.2020 14:01
question
Mathematics, 20.09.2020 14:01
question
Business, 20.09.2020 14:01