subject
Mathematics, 14.01.2021 14:10 alexisbcatlett14

The time (t) required to finish a certain job is inversely proportional to the number of persons (p) on the job. If 10
persons can finish the job in 6 hours, how long will it take
for 30 persons to finish the job?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Nick and nora are married and have three children in college. they have an adjusted gross income of 47,400. if their standard deduction is 12,600 itemized deductions are 14,200 and they get an exemption of 4000 for each adult and each dependent what is their taxable income
Answers: 3
question
Mathematics, 21.06.2019 18:30
Which expression is not a polynomial?
Answers: 2
question
Mathematics, 21.06.2019 20:30
    choose the correct definition for  extremo.  a.  end      b.  extra      c.  extract      d.  eventual 
Answers: 2
question
Mathematics, 21.06.2019 22:20
(b) suppose that consolidated power decides to use a level of significance of α = .05, and suppose a random sample of 100 temperature readings is obtained. if the sample mean of the 100 temperature readings is x⎯⎯ = 60.990, test h0 versus ha and determine whether the power plant should be shut down and the cooling system repaired. perform the hypothesis test by using a critical value and a p-value. assume σ = 5. (round your z to 2 decimal places and p-value to 4 decimal places.)
Answers: 2
You know the right answer?
The time (t) required to finish a certain job is inversely proportional to the number of persons (p...
Questions