subject
Mathematics, 08.01.2021 21:30 joeyhd

A civil engineering firm is analyzing street routes from the theatre to the park. It is considering a big construction project near the library which is 2 blocks north and 6 blocks east of the theatre. So as not to increase traffic, it will delay this project until the early winter if the probability of a random driver going through the library intersection is above 0.2. Will the engineering firm need to delay the project? Best explained answer will be marked brainliest.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
The slope of a line is –2 and its y-intercept is (0, 3). what is the equation of the line that is parallel to the first line and passes through (2, 2)? a. 2x + y = 6 b. y = –2x + 3 c.y=1/2x +6 d.y=-2x-6
Answers: 1
question
Mathematics, 21.06.2019 16:40
This question awards 100 ! i really don’t want to fail i will also mark you !
Answers: 2
question
Mathematics, 21.06.2019 20:00
How many grams the dog will eat in 3 days?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Using the information in the customer order, determine the length and width of the garden. enter the dimensions. length: feet width: feet
Answers: 3
You know the right answer?
A civil engineering firm is analyzing street routes from the theatre to the park. It is considering...
Questions
question
Social Studies, 15.07.2019 22:00
question
History, 15.07.2019 22:00