subject
Mathematics, 08.01.2021 14:00 jasminelynn135owmyj1

A new factory is growing fast and hiring a lot of new workers. Every week, the total number of workers doubles in size. If it takes 18 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
What is the perimeter of a rectangular building that is 80 feet wide and 140 feet deep?
Answers: 1
question
Mathematics, 21.06.2019 19:50
Prove (a) cosh2(x) − sinh2(x) = 1 and (b) 1 − tanh 2(x) = sech 2(x). solution (a) cosh2(x) − sinh2(x) = ex + e−x 2 2 − 2 = e2x + 2 + e−2x 4 − = 4 = . (b) we start with the identity proved in part (a): cosh2(x) − sinh2(x) = 1. if we divide both sides by cosh2(x), we get 1 − sinh2(x) cosh2(x) = 1 or 1 − tanh 2(x) = .
Answers: 3
question
Mathematics, 21.06.2019 20:50
Find the missing variable for a parallelogram: a = latex: 32in^2 32 i n 2 h = b = 6.3 in (1in=2.54cm)
Answers: 2
question
Mathematics, 21.06.2019 21:30
Find the ratios of the corresponding sides
Answers: 2
You know the right answer?
A new factory is growing fast and hiring a lot of new workers. Every week, the total number of worke...
Questions
question
Chemistry, 13.04.2021 06:20
question
History, 13.04.2021 06:20
question
History, 13.04.2021 06:20