subject
Mathematics, 23.12.2020 01:00 robert7248

1. A certain manufacturing process to build phone batteries results in the production of defective batteries at a rate of 5% (0.05). Suppose that 10 batteries are produced. a. Find the expected number of defective batteries. b. Find the variance and standard deviation in the number of defective batteries. c. Find the probability that at least 1 battery is defective.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
What is the explicit formula for this sequence? -7, -4, -1, 2, a.) an = 8 + (b - 1)3 b.) an = -7 + (n - 1)3 c.) an = 3 + (n -1) (-7) d.) an = -7 + (n - )
Answers: 1
question
Mathematics, 21.06.2019 23:30
Katie wants to collect over 100 seashells. she already has 34 seashells in her collection. each day, she finds 12 more seashells on the beach. katie can use fractions of days to find seashells. write an inequality to determine the number of days, dd, it will take katie to collect over 100 seashells.
Answers: 1
question
Mathematics, 22.06.2019 00:00
Which of the following is the maximum value of the equation y=-x^2+2x+5 a. 5 b. 6 c. 2. d. 1
Answers: 1
question
Mathematics, 22.06.2019 01:00
Y= x – 6 x = –4 what is the solution to the system of equations? (–8, –4) (–4, –8) (–4, 4) (4, –4)
Answers: 1
You know the right answer?
1. A certain manufacturing process to build phone batteries results in the production of defective b...
Questions
question
English, 16.07.2019 10:00