subject
Mathematics, 21.12.2020 17:50 GaySpaghetti

You needed a supplier that could provide parts as close to 76.8 inches in length as possible. You receive four contracts, each with a promised level of accuracy in the parts supplied. Which of these four would you be most likely to accept? a) Mean of 76.8 with a 95% confidence interval of 76.6 to 77.0
b) Mean of 76.800 with a 99% confidence interval of 76.5 to 77.1
c) Mean of 76.8 with a 99% confidence interval of 76.6 to 77.0
d) Mean of 76.800 with a 90% confidence interval of 76.6 to 77.0

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:40
Find the volume of the described solid.the solid lies between planes perpendicular to the x-axis at x = 0 and x=7. the cross sectionsperpendicular to the x-axis between these planes are squares whose bases run from the parabolay=-31x to the parabola y = 30/x.a) 441b) 147c) 864d) 882
Answers: 1
question
Mathematics, 21.06.2019 19:20
Askyscraper is 396 meters tall. at a certain time of day, it casts a shadow that is 332 meters long.at what angle is the sun above the horizon at that time?
Answers: 1
question
Mathematics, 21.06.2019 19:30
In the geometric progression –3, 12, −48… what term is 3,072?
Answers: 2
question
Mathematics, 21.06.2019 20:40
Which questions would most a reader identify the author's purpose for writing? check all that apply. what type of text is this? what type of reviews did the book receive? how many copies of the book have been sold? what is the central idea? how does this text make one feel?
Answers: 2
You know the right answer?
You needed a supplier that could provide parts as close to 76.8 inches in length as possible. You re...
Questions
question
Mathematics, 17.12.2020 21:50
question
History, 17.12.2020 21:50
question
History, 17.12.2020 21:50
question
Computers and Technology, 17.12.2020 21:50
question
History, 17.12.2020 21:50
question
Mathematics, 17.12.2020 21:50