subject
Mathematics, 13.12.2020 14:00 kukisbae

Daniel can paint a house in 10 days, while his father can paint the same house in 6 days. If they work together, how long will they finish the job? I need asap answer pl

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 21:30
Carl's candies has determined that a candy bar measuring 3 inches long has a z-score of +1 and a candy bar measuring 3.75 inches long has a z-score of +2. what is the standard deviation of the length of candy bars produced at carl's candies?
Answers: 1
question
Mathematics, 21.06.2019 22:20
The figure shows triangle def and line segment bc, which is parallel to ef: triangle def has a point b on side de and point c on side df. the line bc is parallel to the line ef. part a: is triangle def similar to triangle dbc? explain using what you know about triangle similarity. part b: which line segment on triangle dbc corresponds to line segment ef? explain your answer. part c: which angle on triangle dbc corresponds to angle f? explain your answer. asap
Answers: 3
question
Mathematics, 21.06.2019 23:10
Aramp rises 4 feet over a distance of 10 feet. what is the length of the ramp?
Answers: 3
question
Mathematics, 21.06.2019 23:30
Jane has 5 nickels.john has 3 dimes.jane says she has a greater amount of money.with the information given,is she correct?
Answers: 3
You know the right answer?
Daniel can paint a house in 10 days, while his father can paint the same house in 6 days. If they wo...
Questions